Local News

SA Water Work May Cause Traffic Headache For Murray Bridge Residents

DuctileIronConcreteLined.jpg

Murray Bridge residents who use Mannum Rd at Northern Heights will face some disruptions from this week, with SA Water working to replace a damaged pipe.

The old pipe had been cracking and leaking, forcing the company to replace a 250 metre stretch of it with a PVC alternative.

The work will begin this week with a trench the be dug in the road surface causing some traffic delays. There will also be a water supply disruption when the old pipe is disconnected, residents will be notified in the mail.

 

Image: Wiki Commons